Divi  WordPress Theme By ElegantThemes, Theme Type: Business, E-Commerce, Portfolio ,   free trial: available
Divi is a smart, flexible and powerful WordPress theme with an advanced page builder that allows you to create your own layouts, giving you complete creative control over your website. The theme lets you easily build any type of mobile friendly responsive website – an online portfolio, business website, ecommerce store, professional blog or anything else.
Divi has an advanced drag & drop page builder together with a robust collection of modules that lets you to create truly unique and dynamic pages from the ground up, giving you complete control of the layout and design of your site without needing to learn code. The design elements in Divi are broken down into building blocks (sections, rows, columns and widgets) that can be customised and arranged in any number of ways using Divi’s drag and drop builder. The layouts you create will look perfect on every device with its mobile responsive design.
Divi is fully responsive, so no matter how you build your website it will look great on all devices. It comes with 10 pre made layouts you can use to build on: four homepage layouts for business, commerce, portfolio, and blog, as well as pages for a project case study, a blog, portfolio, and a shop. Divi supports WooCommerce so you can use it for a full ecommerce store or have a shop section in your website.
Some of the other features of this powerful WordPress theme builder include: full width design, portfolio module and premade portfolio layouts, various blog layouts, business modules, video background options, theme options and customizer so you can easily adjust colours, fonts and all other aspects of your website.

 
						
					 
						
					