Flexible WordPress Theme By ElegantThemes, Theme Type: Portfolio , free trial: available
Flexible is a sleek and modern portfolio WordPress theme with a responsive design. The feature rich theme has a modern minimal design aimed to put the focus firmly on your content. Flexible has a sortable ajax powered multimedia gallery that smoothly loads gallery items that can be sorted into different categories without reloading the page. The portfolio gallery also supports video, so you can display your youtube or vimeo videos along side your image based projects. Other features include a CSS control panel for unlimited colour schemes, dozens of fonts, automated thumbnail resizing, extensive options panel and a fully responsive design that will adapt to look perfect on any screen size and device.
Features
- Fully responsive design
- Unlimited colour schemes
- Sortable Ajax gallery
- Video support – the gallery also supports video
- Lots of font options
- Advertising management
- Automated thumbnail resizing
- ePanel theme options
- Page templates
- Shortcodes
- Complete localization
- Optional blog style structure
- Cross browser compatibility
- PSD files
- Valid XHTML and CSS
- Support and updates
Price:
Membership: $39 (unlimited access to 77+ themes)
