Nexus WordPress Theme By ElegantThemes, Theme Type: Magazine, Portfolio , free trial: available
Nexus is a versatile and modern magazine WordPress theme with a drag and drop homepage builder that allows you to create your own homepage layouts. The theme is packed full of options, custom widgets and content modules that give you full control over your page.
Features
- Homepage Drag & Drop Builder – you have complete control over what appears on the homepage. Add, remove, and re-arrange content modules using the intuitive homepage drag and drop builder
- Responsive Design – the design is mobile friendly and will adapt to whatever screen size is being used to browse so your website will look great on mobile phones, tablets and and desktop computers
- Featured Posts Section – section on the homepage to showcase featured posts
- Integrated Review System – has an integrated ratings system, making it is easy for you to review products or services
- Unlimited Colour Schemes – easily customize your theme’s colours and background images via the WordPress Theme Customizer. You can quickly change font colours, navigation bar colours, background colours, background images and more
- Advertisement Areas – comes with multiple ad-ready areas which can be managed via the ePanel theme options page
- Typography and Font Options – comes with some great font options. You can quickly preview and select from dozens of fonts from within the Theme Customizer
- Theme Options – allows you to easily control your website without ever touching a line of code. The ePanel options allow you to toggle on and off features, adjust your layout, manage advertisements, control colours, optimize for search engines and more
- Shortcodes – you can create beautiful and complex layouts without having to delve into a sea of complex code. Buttons, boxes, toggled content, tabbed content, slideshow, image slider, password protection, columns, social media, tooltips, author info, column lists, pricing tables, testimonials, drop caps, quotes.
- Page Templates – easily create galleries, contact pages, sitemaps, blog feeds and much more
- Portfolio Section – with a number of different layout possibilities
- Multimedia Portfolio – display video and images with ease
- Blog Section
- Secure Valid Code
- Navigation – allows you to easily add and remove links, adjust dropdown menu settings and change the order of your links
- Layout Options – allows you to adjust the structure of your site
- SEO Control – manage your titles, keywords and description meta tags, as well as canonical URLs for your homepage, posts, pages and categories
- Integration – allows you to input code into various areas in the theme. This is useful for adding, for example, social media or analytics snippets
- Complete Localisation
- Browser Compatibility
- Perpetual Updates
Price:
Personal: $39/y (unlimited access to all themes)
Developer: $89/y (all themes, plugins and photoshop files)
Lifetime Access: $249 (complete access to everything for life)
