Trim  WordPress Theme By ElegantThemes, Theme Type: Blogging, Business, Minimal, Multi-Purpose, Portfolio ,   free trial: available
Trim is a simple and fast WordPress theme with a professional, versatile and lightweight design suitable for a variety of different websites. The theme has a fully responsive design meaning the theme will adapt to any screen size to insure that your content is readable on any device. Other features include an optional blog style structure, 3 alternative sliders, advertising management options, and a control panel with heaps of customisation options for colours, fonts, backgrounds and much more.
Trim WordPress theme Features
- Fully Responsive Design
- Lightweight and Super Fast
- Unlimited Colour Schemes
- Optional Blog Style Structure
- Dozens of Font Options
- 3 Alternative Slider Layouts
- Automated Thumbnail Resizing
- Advertising Management Options
- ePanel Theme Options
- Page Templates
- Shortcodes Collection
- Complete Localization
- Support and Updates
Price: 
Membership: $39 (unlimited access to 70+ themes)

 
						
					 
						
					